M&M Outdoor Teepee Tent Swing Instruction Manual

and warnings reduces the likelihood of serious or fatal injury.

ASSEMBLY WARNING:

Due to the presence of small parts during assembly, keep

out of reach of children until assembly is complete.

To prevent serious injury, children must not use the swing

until properly installed. Do not use swing if any damage or

deterioration is detected or parts are missing. Contact point

of purchase retailer or M&M Sales Enterprises, Inc.

Never substitute parts.

Please keep instructions for future reference.

ASSEMBLY INSTRUCTIONS:

Assembly should be completed by adult person(s).

We intend for our products to bring joy not frustration.

A flat level surface approximately 5 ft. x 5 ft. will be

needed to spread out materials for assembly.

One hex wrench is included for tightening the eye bolts.

Lay out all necessary swing components pictured.

Unfold material swing cover on level surface with design facing up.

Insert one curved metal tube with foam through

the swing cover sleeve. Before inserting the

remaining tubes, note the direction of the first

tube. All narrow ends of tube will fit into wider

opening end of an adjoining tube. Insert the

remaining three tubes.

Add washer and nut to the bottom side of tube bolt

and secure. Tighten with wrench. Repeat steps 3,

4 and 5 on remaining three straps with remaining

three screw ends. Pull the hook/loop straps back

over the tubing frame and attach to the hook/loop

fastener on underside of swing.

INSTALLATION

TREE LIMB OR CROSS BAR ASSEMBLY:

First test the tree limb or cross bar to ensure that it is

secure, it will support at least 250 lbs., is over level ground,

has a minimum height of 7 feet and is no less than 6 feet

on all sides from vertical elements. Swing should have a

clearance of at least 1.5 times the total length of all the

rope measured from the tree limb/horizontal beam to the

tree strap attachment point. (See: Figure 1)

GENERAL INSTRUCTIONS:

DO NOT install home playground equipment

over concrete, asphalt, packed earth, grass,

carpet or any other hard surface — A fall onto a

hard surface can result in serious injury or death

to the equipment user.

To prevent serious injury, equipment must not

be used until properly installed.

ADJUST SWING HEIGHT

Adjust swing hanging length so platform is

parallel with ground. Bottom of swing should

be no more than 24 inches and no less than 18

inches from the ground.

Never add extra length to chain or rope.

The chains or ropes provided are the maximum

length designed for the swinging element(s).

NOTE: Continued on Back Side

Insert all narrow ends

of tube into wider

end of adjoining tube,

making sure to align the

overlapping holes.

Clip the carabiner through both

o-rings at the end of each rope

set and tighten. Lastly, place the

buckle on the Teepee Tent cover

through the carabiner. Buckle to

secure and tighten.

Swing with or

without Teepee

Tent Cover

Pull the eye bolt ends of each rope

through the canvas slots. Slide one

regular washer and one lock washer

onto the eye bolt. Then, insert the

eye bolt through the holes formed

at the tube's connection points.

Finished Teepee Tent

Swing should look as

pictured above. Ropes

should not cross each

other above swing.

Hang and enjoy.

At least 6'

trunk or 1.5x

the length the

swing rope.

18"(min)-24"(max) ground clearance.

Tree Strap

Table of Contents

Summary of Contents for M&M Outdoor Teepee Tent Swing